Monday, May 19, 2008

Home Projects & Upkeep

Ride home Friday was slow. Strong SW winds really made it difficult. Friday after work spent 3 hours cutting grass. Saturday cleaned up garage a bit to find stuff and make life less frustrating, worked on bathroom, mechanic Dave came and picked up the Triumph motor and parts. Tori's Uncle put landscaping blocks around the side of house. Tori's aunt's sister came over w/ her b-friend who does doors and windows to measure up the doors...I went grocery shopping. Randy and Marshall stopped by to look at the brick siding that I need a hole popped in for exhaust fan. Came back to find tori's 2 uncle's and a grandpa and then her mom came over. I grilled out and prepped food for all of them. Then everyone left and I had to clean up and put everything back in it's place.
Sunday worked on the bathroom from 7:30 am - 7:30 pm. Boxed out ceiling for drywall, hung can lights and fan, new switch box/switches and outlets and wired all up. Now going from two can lights and a fan to two can lights and a fan/light combo. More wires and another switch. New one didn't fit.
S0 no SMBRide or Sunday Aft Tri training. All work.....not a weekend but a workend I guess which was ok...gave legs a little time to re-coup. Good progress was made and hope to keep up the momentum.
Today's ride was a bit chilly...pulled out some winter gear for today's ride. Ride in numbers are:
40 degrees NW wind @ 2 mph/7.7 miles/16.9 ave/29.1 max/462 odo/27:28 min

No comments: